Description
This 7-story, 330,000 SF on Portland’s Eastside. The new facility will include space for 22 operating rooms, 7 procedure rooms, up to 40 ICU rooms, prep, hold, and recovery rooms, and 34 rooms for the Oregon Burn Center. A portion of the two existing buildings was demolished for two levels of parking to be added to the structure.
This project was completed by SMART Local 16 signatory contractor Streimer Sheet Metal.